The construction works of Katowice Business Point steamed ahead since the last visit on the building site. At present, fourth storey is under way and the works are going very quickly. Each floor is raising with giant strides of one week! At that rate, a final height of eleven storeys can be expected in two months. This hectic pace is allowed thanks to construction parts fabricated out of the building site and which are bringing there ready-built.

