
Final concrete works
Mostostal Warszawa, a prime contractor of the Silesian Philharmonic’s extension, strongly advanced a construction work on the building last weeks. A raw structure of the new five-storey part was topped-out lately and works are carrying out in the interiors. Now, final construction works on a concrete structure are taking place at the back of the site. The Philharmonic will be extended by 2 066 sq. meters to reach the total surface of 5 252 sq. m.